Shuster Issues Statement On Resolution Of FAA Furlough Situation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Apr 30, 2013

Shuster Issues Statement On Resolution Of FAA Furlough Situation

Says FAA Had The Needed Flexibility All Along

The FAA already had the necessary flexibility to keep controllers on the job and contract towers open, but chose not to do so, according to House Transportation  Committee chair Bill Shuster (R-PA). His remarks came in a statement following Friday's passage of the Reducing Flight Delays Act of 2013 (H.R. 1765), which passed the House by a vote of 361 to 41.

“Although the FAA already had the necessary flexibility to implement the sequester in a responsible manner, this legislation ensures beyond a shadow of a doubt that the agency now has more than enough capacity to end air traffic controller furloughs, stop the pain for the traveling public, and protect the economy," Shuster (pictured) said.
 
“Without giving the FAA any additional funding, the bill allows the Secretary of Transportation to transfer funds already in other FAA accounts, which the agency can use to avoid reductions in operations and staffing.  This measure will force a stop to these needless furloughs.  FAA also has the discretion to use this funding to keep air traffic control contract towers open.
 
“Throughout this process, my House and Senate colleagues and I insisted that we put the American people first. I’m glad that all parties came together in the end to do that.”

The FAA said in a statement Saturday that it has suspended all employee furloughs, and that  air traffic facilities would begin to return to regular staffing levels with the system resuming normal operations by Sunday evening.

FMI: http://transportation.house.gov

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC