Full-Scale Assembly And Test of NASA's Orion Spacecraft Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Oct 28, 2015

Full-Scale Assembly And Test of NASA's Orion Spacecraft Underway

Lockheed Martin, NASA Complete Critical Design Review Of The Vehicle

The majority of the Orion spacecraft's Critical Design Review (CDR) has been completed by NASA and prime contractor Lockheed Martin, which means the spacecraft's design is mature enough to move into full-scale fabrication, assembly, integration and test of the vehicle. It also means that the program is on track to complete the spacecraft's development to meet NASA's Exploration Mission-1 (EM-1) performance requirements. The complete Orion EM-1 CDR process will conclude after the European Service Module CDR and a presentation to the NASA Agency Program Management Council in the spring.

Orion's CDR kicked off in August of this year. The review focused on the EM-1 design as well as additional common elements that will be included on the Exploration Mission-2 (EM-2) spacecraft. These elements include the structure, pyrotechnics, Launch Abort System, software, guidance, navigation and control, and many others.

Although the EM-1 vehicle is designed to accommodate all the necessary elements for human exploration of deep space, systems unique to the EM-2 mission, such as crew displays and the Environmental Control and Life Support System, will be evaluated at a later EM-2 CDR.

"The vast majority of Orion's design is over, and now we will only change things when new requirements come into play," said Michael Hawes, Lockheed Martin Orion vice president and program manager. "Considering the incredible complexity of this spacecraft, the team is very proud to have successfully completed the design review and is looking forward to seeing it fly."

In early 2016, Orion's crew module pressure vessel will be shipped to the Operations and Checkout Facility at NASA's Kennedy Space Center. There it will undergo final assembly, integration and testing in order to prepare for EM-1 when Orion is launched atop NASA's Space Launch System (SLS) for the first time. The test flight will send Orion into lunar distant retrograde orbit—a wide orbit around the moon that is farther from Earth than any human-rated spacecraft has ever traveled. The mission will last more than 20 days and will help certify the design and safety of Orion and SLS for human-rated exploration missions.

(Source: Lockheed Martin news release. Images from file)

FMI: www.lockheedmartin.com/orion

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC