Flight Demonstration Of NASA's UAS Traffic Management Technologies Announced | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Mon, Mar 05, 2018

Flight Demonstration Of NASA's UAS Traffic Management Technologies Announced

Will Take Place at Reno-Stead Airport

A demonstration of NASA's NASA's UAS Traffic Management Technologies has been scheduled for March 8 at Reno-Stead airport in Nevada.

The flight demonstration, called UTM Technology Capability Level 3 (TCL3) will focus on flying small and large, remotely-operated aircraft, or drones in various NASA communication, navigation, and surveillance (CNS) and drone detection scenarios. For the first time, Nevada is unveiling an innovative Unmanned Traffic Management Drone Detection capability with participation of the top global drone detection companies. Drone detection is major concern across the UAS Industry and Nevada is leading the way to advance this technology in the Public Safety category. Nevada is doing this through an innovative airspace management system that sets Nevada apart from other states. Nevada is also demonstrating long-range communications between Reno and Las Vegas during this demonstration, which is important for NASA beyond visual line of sight operations and future Nevada operations. These new Nevada capabilities are routed through the Switch Fiber Optic SUPERLOOP – Nevada has the first FAA-designated UAS Test Site to advance such capability in the U.S.

It is envisioned that UTM will have a mechanism to allow for basic services such as flight planning, flight monitoring, hazardous weather and wind avoidance and other potential services. Most of these services will be provided by a number of commercial UAS Service Suppliers (USS) rather than by a single system. These USS's then support missions by UAS operators.

The flight campaign, which is to run March 5 to March 9 at the Nevada FAA- designated UAS Test Site at the Reno-Stead Airport will be the third iteration of UTM testing. The test sites are partnering with government, industry, and academia to complete the flight tests. This second phase will demonstrate, evaluate, and refine functional designs and technology prototypes that will advance airspace traffic management for NASA and the highly competitive DOT / FAA UAS Integration Pilot Program set to be awarded in April 2018.

The public demonstration will take place Thursday, March 8, 8:30 a.m. – 11:00 a.m. PST

(Source: Nevada Institute for Autonomous Systems (NIAS) release. Image from file)

FMI: www.nasa.gov, diversifynevada.com, nias-uas.com

Advertisement

More News

Airborne 11.05.25: Tesla Flying Car?, Jepp/ForeFlight Sold, A220 Troubles

Also: AFE25 Tickets!, Jamaica Recovery, E-Aircraft at Boeing Fld, Diamond DA50 RG Cert Elon Musk is once again promising the impossible…this time, in the form of a Tesla tha>[...]

Airborne 11.07.25: Affordable Expo Starts!, Duffy Worries, Isaacman!

Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]

Aero-News: Quote of the Day (11.05.25)

“Our strategic partnership with AutoFlight, backed by their substantial technological expertise and tangible advancements in eVTOL airworthiness, represents a significant mil>[...]

ANN's Daily Aero-Linx (11.05.25)

Aero Linx: British Gliding Association (BGA) The British Gliding Association is the governing body for the sport of gliding in the UK and members are the 76 clubs that provide glid>[...]

NTSB Prelim: Cirrus Design Corp SR22

While Descending Toward ASN, He Advanced The Throttle, But The Engine Did Not Respond On October 2, 2025, at 1126 central daylight time, a Cirrus SR22, N812SE, was substantially da>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC