NTSB: JAL 787 Batteries Did NOT Exceed Voltage Limits | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 10.29.14 ** HD iPad-Friendly -- Airborne 10.29.14 **
** Airborne 10.27.14 ** HD iPad-Friendly -- Airborne 10.27.14 **
** Airborne/NBAA2014 10.24.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.24.14 **

Mon, Jan 21, 2013

NTSB: JAL 787 Batteries Did NOT Exceed Voltage Limits

NTSB Provides Third Investigative Update on Boeing 787 Battery Fire in Boston 

The National Transportation Safety Board has released a third update on its investigation into the Jan. 7 fire aboard a Japan Airlines Boeing 787 at Logan International Airport in Boston.

The lithium-ion battery that powered the auxiliary power unit has been examined in the NTSB Materials Laboratory in Washington. The battery was x-rayed and CT scans were generated of the assembled battery. The investigative team has disassembled the APU battery into its eight individual cells for detailed examination and documentation. Three of the cells were selected for more detailed radiographic examination to view the interior of the cells prior to their disassembly. These cells are in the process now of being disassembled and the cell's internal components are being examined and documented.

Investigators have also examined several other components removed from the airplane, including wire bundles and battery management circuit boards. The team has developed test plans for the various components removed from the aircraft, including the battery management unit (for the APU battery), the APU controller, the battery charger and the start power unit. On Tuesday, the group will convene in Arizona to test and examine the battery charger and download nonvolatile memory from the APU controller. Several other components have been sent for download or examination to Boeing's facility in Seattle and manufacturer's facilities in Japan.

Finally, examination of the flight recorder data from the JAL B-787 airplane indicate that the APU battery did not exceed its designed voltage of 32 volts.

In accordance with international investigative treaties, the Japan Transport Safety Board and French Bureau d'Enquêtes et d'Analyses pour la sécurité de l'aviation civile have appointed accredited representatives to this investigation. Similarly, the NTSB has assigned an accredited representative to assist with the JTSB's investigation of the Jan. 15 battery incident involving an All Nippon Airways B-787. Both investigations remain ongoing.

FMI: www.boeing.com, www.ntsb.gov, www.twitter.com/ntsb

 


Advertisement

More News

Airborne 10.29.14: Antares Launch Failure, GAMA Responds, Another 'Roadable'???

Also: Dragon Returns, Quadcopter Flown At Airliner?, Classic Aero-TV: Redhawk, Diesel Flt School Airplanes, WWII Bomber Found The unmanned Antares rocket built by Orbital Science C>[...]

Classic Aero-TV: ‘Have it Your Way!’ – The SPA Panther

A New Single-Seat SportPlane Shows Great Potential For Serious Fun While at the Sport Aviation Expo 2014, ANN CEO and Editor-In-Chief, Jim Campbell stopped by to talk with Dan Wese>[...]

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2014-21-07 PRODUCT: Certain Bombardier, Inc. Model CL-600-2C10 (Regional Jet Series 700, 701, & 702) airplanes, Model CL-600-2D24 (Regional Jet Series 900) airplanes>[...]

AD: Airbus Airplanes

AD NUMBER: 2014-21-10 PRODUCT: Certain Airbus Model A330-200 and -300 series airplanes, and Model A340-200 and -300 series airplanes.>[...]

ANN's Daily Aero-Linx (10.31.14)

Ex-MACs This group is made of retired McDonnell Engineers, most of whom began their careers at MAC either on the F101, F3H or F4H programs.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC