B737 Production To Climb To 42 Airplanes Per Month Beginning In 2014 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jun 16, 2011

B737 Production To Climb To 42 Airplanes Per Month Beginning In 2014

Boeing Says Strong Demand Continues For The Company's Single-Aisle Jetliners

Boeing plans to increase the production rate for its Next-Generation 737 to 42 airplanes per month, the company said Wednesday. Once implemented in the first half of 2014, the 737 program expects to build on average two 737s each workday and nearly 500 airplanes each year.

Boeing Commercial Airplanes President and CEO Jim Albaugh said the market outlook for single-aisle jetliners is strong and growing. "Customers are demanding our Next-Generation 737 at an unprecedented rate," he said. "New performance improvements and enhanced passenger comfort features have driven home the value equation for our customers."

Albaugh emphasized the popularity of Boeing's new passenger comfort features, noting that since its introduction in May 2010, the new Boeing Sky Interior is specified on more than 80 percent of new 737 orders.

737 Program Vice President and General Manager Beverly Wyse said the goal with this rate increase is to continue meeting customer demand with an innovative airplane that provides strong performance and value. "We have worked very closely with our supply chain and our world-class manufacturing team to ensure we can increase rate in an efficient and responsible fashion," Wyse said. "We believe that many of the capital investments and production system changes made for 38 airplanes per month will already position us to build 42," Wyse said. "We are very well situated for this rate increase."

The 737 program currently produces 31.5 airplanes per month and expects to go to 35 per month in early 2012, 38 per month in second quarter 2013, and then to 42 per month in the first half of 2014. The rate increase announced today is not expected to have a material impact on 2011 financial results.

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC