General Atomics Awarded Initial EMALS Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Aug 18, 2014

General Atomics Awarded Initial EMALS Contract

System Will Be Installed On Future Aircraft Carrier John F. Kennedy

U.S. Naval Air Systems Command (NAVAIR) awarded General Atomics (GA) an initial sole-source contract for Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG) for the CVN 79 aircraft carrier to be named John F. Kennedy.

This contract is for the initial procurement of the long-lead-time materials in support of a full production contract for installation of EMALS and AAG into CVN 79, the second of the Gerald R. Ford-class aircraft carriers. CVN 79 is scheduled to be delivered to the U.S. Navy in 2023.

GA Electromagnetic Systems Group will manufacture EMALS and AAG components at its state-of-the-art 367,000 square foot manufacturing facility in Tupelo, Miss.

“These are exciting times. We are beginning EMALS and AAG production for the second ship in the class, CVN 79, as these systems are being integrated into the Gerald R. Ford (CVN 78). We are proud to be part of the team that is putting cutting-edge technology into the world’s premier aircraft carriers and into the hands of Naval forces,” says Dean Key, Director of Launch and Recovery Production Programs, General Atomics.

GA was awarded the prime contract to provide EMALS and AAG systems for CVN 78 in June 2009 and is manufacturing the CVN 78 hardware concurrently with the System Design and Demonstration (SDD) programs. Hardware delivery to CVN 78 is scheduled to be completed in 2014.

(Image provided by General Atomics)

FMI: www.navy.mil, www.ga.com

 


Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC