Air Force, Boeing Agree On Final KC-46 RVS 2.0 Design | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne Unmanned

Airborne Unlimited-Wednesday Airborne Flight Training

Airborne Unlimited-
Friday

Airborne-ANN Airborne Unlimited--01.11.21 Airborne-Unmanned--01.12.20 Airborne Unlimited--01.13.21 Airborne-Flight Training--01.14.20 Airborne Unlimited--01.15.21

Airborne On YouTube

Airborne Unlimited--01.11.21

Airborne-Unmanned--01.12.20

Airborne Unlimited--01.13.21 Airborne-Flight Training--01.14.20

Airborne Unlimited--01.15.21

Sun, Apr 12, 2020

Air Force, Boeing Agree On Final KC-46 RVS 2.0 Design

Agreement Provides Boeing $882 Million Of Withheld Payments For Previous Non-Compliance

The Air Force and Boeing reached two agreements last week to implement a final KC-46A Pegasus Remote Vision System design, known as RVS 2.0, and help counter COVID-19 impacts on the defense industrial base.

The two Memorandums of Agreement (MOA) will be incorporated in the KC-46 contract.

The first MOA institutes the redesign and retrofit of RVS 2.0 in full compliance with the contract requirements at no additional cost to the government. This agreement addresses deficiencies that hindered safe and effective refueling operations.

RVS 2.0 will include 4K color cameras with proper viewing geometry, operator stations with larger screens, a laser ranger for refueling aircraft distance measurement and boom assistance augmented reality. With the help of scientists and engineers from both enterprises, the Air Force will lead design reviews and approve specifications to drive the partnership toward initial fielding in 2023.

The second and separate MOA acknowledges possible impacts of the COVID-19 outbreak on our nation and the defense industrial base, and releases previously withheld contract payments to help ensure successful performance under the program.

This agreement provides Boeing $882 million of withheld payments for previous non-compliance in 33 KC-46 deliveries.

This withhold release is in line with Department of the Air Force and Department of Defense policies to maximize cash flow, where prudent, to combat coronavirus impacts on the industry base. Within 120 days, the Air Force and Boeing will conduct an expedited process to determine final specification compliance or non-compliance.

The Air Force and Boeing are committed to delivering a fully-operational tanker to the warfighter and ensuring the continued viability of an essential member of the defense industrial base.

"The Air Force and Boeing will make the KC-46 synonymous with aerial refueling excellence. The agreement we announced today takes advantage of new remote vision systems technologies that are orders of magnitude better than what was available when the program started," Boeing said in a statement.

"Generations of women and men in uniform will benefit from the advancements we are making in the science of visualization systems. Not only will these advancements benefit the KC-46 by preparing it for future capabilities like autonomous refueling, they will also benefit other programs for years to come. The investments we continue to make in the KC-46 clearly demonstrate Boeing’s commitment to Pegasus being the standard by which all future refueling aircraft are measured."

(Source: News releases. Image from file)

FMI: www.af.mil
www.boeing.com

Advertisement

More News

ANN's Monday/Holiday Schedule

In Proper Observance Of The Federal Holiday... Monday is Martin Luther King, Jr. Day.... ANN will observe the Federal holiday, but will still be active with some news and info, due>[...]

Aero-News: Quote of the Day (01.18.21)

"We’re excited to announce that the National Championship Air Races are scheduled to return for its 57th year on September 15-19, 2021, pending COVID-19 restrictions. After c>[...]

ANN's Daily Aero-Term (01.15.21): LORAN

LORAN An electronic navigational system by which hyperbolic lines of position are determined by measuring the difference in the time of reception of synchronized pulse signals from>[...]

ANN's Daily Aero-Linx (01.15.21)

Aero Linx: The Commemorative Air Force Dixie Wing The Commemorative Air Force Dixie Wing was granted a Provisional Charter on February 28, 1987, and a Wing Charter No. 48 on Januar>[...]

Klyde Morris (01.15.21)

Klyde Is Settling Into 2021 Better Than Expected... FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2021 Web Development & Design by Pauli Systems, LC