Harris To Upgrade FAA WARP Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Apr 07, 2005

Harris To Upgrade FAA WARP Facility

$57 Million Weather and Radar Processor Follow-on Contract

The FAA has awarded Harris Corporation a 54-month, $57 million follow-on contract for the Weather and Radar Processor (WARP) program, bringing the overall value of the program for Harris to $188 million by 2009. The WARP Maintenance and Sustainment (WMSS) program will provide the FAA with complete hardware and software support throughout the life of the program.

The Air Route Traffic Control Centers (ARTCCs) already have been using WARP to enable controllers to view real-time, graphical weather data at their positions under a $131 million program awarded to Harris in 1996. WARP provides advanced, Next-Generation Radar (NEXRAD) weather data directly to the controller displays, replacing the more cumbersome, alphanumeric data displays used previously.

"I remember how exciting it was when the WARP system was declared fully operational by the FAA on December 31, 2002," said Al Dukes, president of the Civil Programs business unit of Harris Corporation's Government Communications Systems Division (GCSD). "We are very pleased that the FAA selected Harris to continue to support this key initiative as part of the FAA's modernization efforts. We are proud that Harris systems integration expertise, weather technology, and systems support are enhancing the safety of our nation's air traffic system."

WARP is a next-generation weather and radar processor that provides the FAA with the software tools to consolidate weather data from several sources into a single, integrated display to support air traffic operations. Harris was tasked with developing, procuring, installing, and supporting WARP systems at the country's 21 ARTCCs, the Air Traffic Control System Command Center, and the William J. Hughes Technical Center.

FMI: www.harris.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC