Dream Chaser Spacecraft Passes Another NASA Milestone | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Apr 02, 2019

Dream Chaser Spacecraft Passes Another NASA Milestone

Ground And Flight Operations Enabled, First Flight In 2021

Sierra Nevada Corporation’s (SNC) Dream Chaser spacecraft passed NASA’s Integrated Review Milestone 5 (IR5), a key status check on SNC’s performance of a variety of ground and flight operations.

IR5 demonstrates that the Dream Chaser team is on track to operate the space vehicle in advance of the first mission to the International Space Station under the Commercial Resupply Services Contract 2 (CRS-2). “This milestone is a great accomplishment for the team focused on operations development and demonstration. It shows we can operate the Dream Chaser from the ground, including getting critical science in and out of the vehicle,” said John Curry, CRS-2 program director within SNC’s Space Systems business area.

The review included development of the vehicle’s flight computers and software, mission simulator and Mission Control Center.  SNC also performed cargo demonstrations using high fidelity mock-ups of the vehicle and its cargo module, showing loading and unloading time and efficiency.

Milestone testing took place at SNC’s Louisville, Colorado and NASA Kennedy Space Center facilities.  Data was also used from the Dream Chaser 2017 free-flight test at Edwards Air Force Base, California, with the help of NASA's Armstrong Flight Research Center. “Our Dream Chaser team continues to successfully execute milestones as we move closer to getting this spacecraft into space,” said Fatih Ozmen, SNC’s owner and CEO.  “The orbital spacecraft is being built and this milestone demonstrates the vehicle keeps passing key reviews and is making great strides.”

Dream Chaser continues to meet technical and scheduled milestones on its way to first flight in spring 2021. The Dream Chaser will conduct at least six orbiting flights to the space station, delivering equipment and supplies to advance space exploration and then safely return life science and other time-critical items on a conventional runway.

(Source: Sierra Nevada Corp. news release. Image from file)

FMI: www.sncorp.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC