NATA Takes Action To Ensure Continued Charter Use Of Pilatus PC-12s | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Aug 08, 2017

NATA Takes Action To Ensure Continued Charter Use Of Pilatus PC-12s

Association's Air Charter Operators Town Halls Reveal Critical Industry Challenges

NATA has announced the resolution of a compliance issue stopping air charter operators from adding certain Pilatus PC-12 aircraft to their certificates. Guidance documents published today now offer charter operators a clear pathway to utilizing these aircraft.

At an NATA Air Charter Operators Town Hall earlier this year, a company alerted the association that a local FAA office had denied requests to add to their operating certificate several PC-12 aircraft intended for passenger operations. Because the Pilatus PC-12 is a single-engine aircraft, passenger operations require compliance with certain additional Part 135 regulations, including specific electrical system requirements (14 CFR 135.163(f)).

“NATA launched its nationwide series of town halls to allow us to hear directly from the air charter community about situations that impact their ability to operate successful businesses. In this instance, NATA immediately reached out to FAA headquarters staff to understand and resolve the issue. We discovered that this was not a challenge limited to one company, but rather multiple operators across the country were experiencing the same problem,” stated NATA President Martin H. Hiller.

“There was debate within the FAA over whether and how older model Pilatus PC-12s meet the electrical power requirements applicable to passenger operations under instrument rules in a single-engine aircraft,” added John McGraw, NATA Director of Regulatory Affairs. “After numerous meetings between NATA, FAA and aircraft manufacturing representatives, the impasse surrounding the electrical loads of the PC-12 has been resolved. Today, the FAA has published an information for operators document, InFO 170011, clarifying the process for evaluating certain older PC-12 aircraft for passenger-carrying operations under Part 135. Concurrently, the FAA issued new inspector guidance reflecting the same information and procedures as outlined in the InFO.”

“We appreciate the FAA leadership’s willingness to listen to all perspectives, including that of the air charter community and thank the agency for reaching a decision that all parties find acceptable. Our NATA Air Charter Operators Town Halls continue and I encourage the entire community to participate, situations like this demonstrate their value to the entire industry,” concluded Hiller.

NATA’s upcoming Town Halls take place August 23rd at Global Aviation in Portland, Oregon, and August 24th at King County International Airport in Seattle, Washington. Attendance is free and open to all aviation businesses.

(Source: NATA news release. Image from file)

FMI: www.nata.aero/events

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC