First Winglet Set For Bombardier CSeries Aircraft Delivered | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Jan 15, 2013

First Winglet Set For Bombardier CSeries Aircraft Delivered

Composite Wingtip Devices Designed To Extend Range And Cut Operating Costs

The first production aircraft set of winglets has been delivered to Bombardier Aerospace, Belfast for the new Bombardier CSeries aircraft that will serve the 100– to 149-seat market segment.

GKN's delivery of the composite winglets has followed a three-year design, test and initial manufacturing programme which has minimised winglet weight and complexity and maximized aircraft fuel efficiency through improved design and state-of-the-art manufacture and assembly. The CSeries aircraft is scheduled to enter into service in 2014.

GKN says the winglets will make an important contribution to the CSeries aircraft’s targets in relation to fuel burn, emissions, range and performance, which Bombardier projects will beat any current aircraft in its class. Across aviation, winglets are transforming the performance of aircraft, reducing wing drag to bring significant fuel savings - with consequent reductions in aircraft emissions and improvements in payload and range.
 
“The design and development of this winglet has involved the full expertise of our team. We are commencing now on a production programme that will continue beyond the end of the first quarter of this century,” said Phil Swash, CEO – Europe & Special Products Group, GKN Aerospace.

(Image provided by GKN Aerospace)

FMI: www.gkn.com/aerospace

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC