SLS Hot Fire Test Imminent | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-Monday

Airborne Unmanned

Airborne Unlimited-Tuesday Airborne Special Edition Airborne Flight Training

Airborne Unlimited-
Friday

Airborne-ANN Airborne Unlimited--03.01.21 Airborne-Unmanned--03.02.20 Airborne Unlimited--03.03.21 Airborne Special Edition--02.11.21 Airborne-Flight Training--03.04.20 Airborne Unlimited--03.05.21

Airborne On YouTube

Airborne Unlimited--03.01.21

Airborne-Unmanned--03.02.20

Airborne Unlimited--03.03.21 Airborne Special Edition--02.11.21 Airborne-Flight Training--03.04.20

Airborne Unlimited--03.05.21

Sat, Jan 16, 2021

SLS Hot Fire Test Imminent

Eighth And Final Test Of The Green Run Series

NASA is targeting a two-hour test window that opens at 5 p.m. EST Saturday, Jan. 16, for the hot fire test of NASA’s Space Launch System (SLS) rocket core stage at the agency’s Stennis Space Center near Bay St. Louis, Mississippi.

The hot fire is the eighth and final test of the Green Run series to ensure the core stage of the SLS rocket is ready to launch Artemis missions to the Moon, beginning with Artemis I. The core stage includes the liquid hydrogen tank and liquid oxygen tank, four RS-25 engines, and the computers, electronics, and avionics that serve as the “brains” of the rocket.

During the test, engineers will power up all the core stage systems, load more than 700,000 gallons of cryogenic, or supercold, propellant into the tanks, and fire all four engines at the same time to simulate the stage’s operation during launch, generating 1.6 million pounds of thrust.

The first in a series of increasingly complex missions, Artemis I will test the SLS rocket and Orion spacecraft as an integrated system ahead of crewed flights to the Moon. Under the Artemis program, NASA is working to land the first woman and the next man on the Moon in 2024.

FMI: www.nasa.gov/artemisprogram/greenrun

Advertisement

More News

ANN's Daily Aero-Linx (03.05.21)

Aero Linx: International Association of Professional Gyroplane Training (IAPGT) We are an Association of people who fly, build or regulate Gyroplanes, who have a dream of a single >[...]

Airborne-Flight Training 03.04.21: Master Instructor, EAA Air Academy, Skyborne

Also: CAE Acquiring L3Harris, USHST Report, FAA Vaccine Report, FRASCA Expands The original and highly regarded Master Instructor program, which arguably set the standard of excell>[...]

Airborne 03.05.21: Starship SN10 Lands, EAA/FAA Virtual Summit, Bearhawk 5

Also: USCG PIlot Rescue, Gulfstream G280, Kalitta Pilots Approve, Supersonic NetJets? On Wednesday, March 3, Starship serial number (SN10) successfully completed SpaceX’s thi>[...]

Aero-News: Quote of the Day (03.05.21)

“The Gulfstream team continues its commitment to the future of the G280 program, ensuring adherence to the most stringent standards, whether for safety, performance or noise >[...]

ANN's Daily Aero-Term (03.05.21): Clearway

Clearway An area beyond the takeoff runway under the control of airport authorities within which terrain or fixed obstacles may not extend above specified limits. These areas may b>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2021 Web Development & Design by Pauli Systems, LC