Airbus Begins Satellite Building On An Entirely New Scale | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Mar 01, 2019

Airbus Begins Satellite Building On An Entirely New Scale

Airbus Friedrichshafen Triples The Size Of Its Integration Facilities

Airbus’ Friedrichshafen site has opened Europe’s most state-of-the-art satellite integration and space technology center, known as the Integrated Technology Centre (ITC). The ITC, which triples the area of clean room space, is dedicated to building satellites, probes, space instruments and experimental technologies. The center took only two years to build at a total cost of approximately $51 million.

“Airbus’s significant investment in this building also represents an investment in the future – both for the Airbus site at Lake Constance and for Baden-Wuerttemberg as an aerospace location. When it comes to space technology, we are now a step ahead of the rest of Germany – in terms of science and research, development and technology, and enthusiasm for the aerospace industry,” said Baden-Wuerttemberg’s Minister-President, Winfried Kretschmann. “With this technology center, Airbus has shown it has the courage to take the leap into a new age of even better satellites, and this includes those intended for scientific purposes. Satellites can, for instance, document changes in sea levels and detect even small sources of greenhouse gas emissions. Satellites of this nature are helping to expand the basic scientific knowledge needed to combat climate change.”

“Space flight has undergone huge positive development over the past few years. In addition to scientific missions to explore our solar system and investigate fundamental physical laws, we as a space company are meeting a swiftly increasing demand for high-performance, ultra-reliable Earth observation, meteorological and navigation satellites,” said Nicolas Chamussy, Head of Airbus Space Systems. “Thanks to the new satellite hub, production at Airbus’s Friedrichshafen site is optimally positioned in terms of both quality and quantity compared with our competitors.”

The building was designed to expand the current satellite integration hall. The new ‘dual’ complex enables projects to be executed more efficiently and economically and, thanks to cutting-edge technology and its new size, also offers new possibilities for developing future space projects, such as large space telescopes.

The centerpiece of the ITC is its large clean room. The final integration of the satellites takes place under clean room conditions of various ‘cleanliness classes’ (from ISO 8 to ISO 5). Extensive air conditioning and filter systems circulate an air volume of 1.1 million cubic yards up to 60 times an hour, which not only ensures the required levels of cleanliness but also a consistently elevated air pressure, in addition to controlling humidity and temperature.

Four seismic blocks, each weighing 150 metric tons, ‘decouple’ special integration tables from the building and ensure a completely vibration-free environment for the installation of optical instruments. A computer-controlled fan and filter matrix on the south side of the clean room generates air-flow profiles that can be adjusted to the occupancy of the room. This concept allows different clean room classes to be created in a single hall with no disruptive partitions or curtains.

In the adjacent check-out rooms, technicians can conduct a broad array of electrical function tests without having to enter the clean room area. All computer systems are housed in their own air-conditioned, noise-insulated racks.

The two wings of the ITC provide a further large integration and laboratory space for component manufacturing and technical areas. The first floor of the building’s west wing houses a conference zone and a multifunctional showroom and information space, whose large panoramic windows provide a unique view of the flight hardware production process.

Four Sentinel satellites for the European environment and security program ‘Copernicus’, the joint European-Japanese EarthCARE Earth observation satellites and two 40-foot-long planar radar antennas are the first projects to move into the new center. The integration work for JUICE, a mission to the icy moons of Jupiter (set to launch in 2022), is also expected to start within the next six months.

(Images provided with Airbus news release)

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC