Embraer’s E190-E2 Program Development Named 2019 'PMI Project Of The Year' | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Oct 09, 2019

Embraer’s E190-E2 Program Development Named 2019 'PMI Project Of The Year'

Recognizes A Large, Complex Project That Best Delivers Superior Performance Of Project Management Practices

Project Management Institute (PMI), the world’s leading association for the project management profession, announced on October 5 that the E190-E2 Program Development– Embraer (São José dos Campos, São Paulo, Brazil) has been awarded the 2019 PMI Project of the Year Award.

For the team involved, bringing the E2 to life was a huge challenge. It is an extremely complex program, with a virtually new airplane, a new production system, a new and more connected airplane and customer support, and a new global supply chain spread through the US, Brazil, Europe and Asia. Despite the challenges, the team was able to develop the program ahead of the original schedule, under budget and better than the original and very competitive spec. The team used an innovative program management model, using several Program and Project Management techniques combined as Mixed Project Arts.

“Embraer built a heritage out of challenging the impossible, starting with the dream of producing airplanes in a country that did not even manufacture bicycles. This passion was passed from generation to generation and 50 years later, the E2 team has proven that it is possible to dream big and develop a new and high-tech commercial jet, outperforming even the highest expectations with a short schedule, a limited budget and a benchmark spec,” said Fernando Antonio Oliveira, E2 Program Director.

The PMI Project of the Year Award recognizes a large (budgets greater than US$100 million) and complex project that best delivers superior performance of project management practices, superior organizational results, and positive impacts on society. This year’s award was presented in Philadelphia, PA as part of the annual PMI Awards Gala at the 2019 PMI Global Conference.

(Source: PMI news release. Image from file)

FMI: www.pmi.org

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC