North Dakota Wind Farm Being Evaluated For Airport Impacts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Dec 06, 2018

North Dakota Wind Farm Being Evaluated For Airport Impacts

Proposed Project Is 12 To 13 Miles From The Bismarck Airport

A wind farm project proposed for a location 15 miles southeast of Bismarck, ND is being evaluated for potential impacts on airport operations at Bismarck Municipal Airport (KBIS).

The Bismarck Tribune reports that the wind farm developers have reduced the height of some of the turbines planned for the project to accommodate concerns expressed by pilots who use the airport. Chicago-based Pure New Energy USA says it has coordinated with the FAA and the airport during its planning process, which has led to the adjustments.

After those adjustment were made, the FAA determined that there would be no substantial impact on air navigation caused by the wind farm, provided that the turbines are properly lighted and marked. But Bismarck Airport Director Greg Haug said that he still has questions about possible interference with airport surveillance radar.

The proposed project is for between 65 and 75 wind turbines on 15,000 acres in southern Burleigh County that would produce 250 megawatts of electricity. The turbines would be between 450 and 570 feet tall.

Proponents cite economic benefits for the county from the project, while opponents, apart from the airport concerns, say it will be unsightly. Bismarck Mayor Steve Bakken, who also serves on the Bismarck Planning Commission, said that no matter which way the vote goes, there will likely be an appeal.

A planning commission meeting was set for Wednesday. The Burleigh County Commission is also expected to hold a public hearing on the project.

(Image from file)

FMI: Source report

Advertisement

More News

NTSB Prelim: Cirrus Design Corp SR20

The Airplane Made An Uncommanded Right Yaw And Roll, And He Was Unable To Maintain Control Of The Airplane On November 11, 2025, about 1750 central standard time, a Cirrus SR20, N8>[...]

ANN's Daily Aero-Linx (11.30.25)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (11.30.25): Wind Shear Escape

Wind Shear Escape An unplanned abortive maneuver initiated by the pilot in command (PIC) as a result of onboard cockpit systems. Wind shear escapes are characterized by maximum thr>[...]

Aero-News: Quote of the Day (11.30.25)

“Working closely with the Polish Armed Forces, we’re focused on disciplined execution to help enhance Poland’s defense capabilities and keep up with the strong de>[...]

Airborne 11.26.25: Bonanza-Baron Fini, Archer v LA NIMBYs, Gogo Loses$$$

Also: Bell 505 on SAF, NYPA Gets Flak For BizAv 'Abuse', FAA Venezuela Caution, Horizon Update Textron Aviation has confirmed it will be ending production of the Beechcraft Bonanza>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC