AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Jan 08, 2020

AD: The Boeing Company Airplanes

AD NUMBER: 2019-25-12

PRODUCT: Boeing Model 777-200 and -300ER series airplanes.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-18-02, which applied to certain The Boeing Company Model 777-200 and -300ER series airplanes.

AD 2016-18-02 required replacing the low-pressure oxygen flex hoses with new non-conductive low-pressure oxygen flex hoses in the gaseous passenger oxygen system in airplanes equipped with therapeutic oxygen. This AD retains those actions and adds actions for certain airplanes.

AD 2016-18-02 was prompted by the determination that the low-pressure oxygen flex hoses in the gaseous passenger oxygen system can potentially be conductive. This AD was further prompted by the determination that the associated service information is inadequate for certain airplanes.

DATES: This AD is effective January 21, 2020. The FAA must receive any comments on this AD by February 20, 2020.

COST: The FAA estimates that this AD affects 0 airplanes of U.S. registry. If an affected airplane is imported and
placed on the U.S. Register in the future, the following are the cost estimates to comply with this AD:

Replacement (actions retained from AD 2016-18-02)

  • Labor: Up to 33 work-hours × $85 per hour = Up to $2,805 per aircraft.
  • Parts: Up to $15,173.
  • Total cost per aircraft: Up to $17,978.

New actions for Group 4, Configuration 2 airplanes

  • Labor: 6 work-hours × $85 per hour =$510 per aircraft.
FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC