Stelia Aerospace Delivers The First BelugaXL Cargo-Door | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.29.25

AirborneNextGen-
09.30.25

Airborne-Unlimited-10.01.25

Airborne-Affordable Flyers-10.02.25

AirborneUnlimited-10.03.25

Fri, Sep 22, 2017

Stelia Aerospace Delivers The First BelugaXL Cargo-Door

First Aircraft To Enter Service In 2019

Airbus has taken delivery of the first main cargo door for the BelugaXL from its supplier Stelia Aerospace. The door is fully equipped with its electric and hydraulic systems. This delivery follows that, early July, of the upper fuselage section, to which the cargo-door will be attached and articulated.

Just like the upper fuselage section, the cargo-door was forwarded last night by road from the Stelia Aerospace plant to Rochefort commercial port, and placed onboard the barge used for the transport of the A380 sections.

It will then be shipped by sea and river to the port of Langon near Bordeaux, then by road following the A380 special transport itinerary, from Langon to Toulouse, where the super-transporter’s final assembly line is located.

With its outstanding dimensions - 10 m (33 feet) long, 9 m (30 feet) deep and 8 m (26 feet) high – this door, with a total weight of 3.4 tons including its systems, and a surface of nearly 140 sq. meters (1,507 sq. feet), is the largest aircraft door ever manufactured in Europe. Bearing specific complex opening and closing systems, this door will enable the loading / unloading of the payload inside the BelugaXL.

Since January 2015, the teams of three Stelia Aerospace sites (Rochefort, Saint- Nazaire and Toulouse) have worked together to ensure the design, manufacturing, assembly and equipment of this "work package", with its associated mechanisms.

After being designed by the Toulouse and Rochefort design offices, the elementary parts were manufactured by the Rochefort and Saint-Nazaire sites as well as Stelia Aerospace’s suppliers, the assembly and testing being then carried out at Rochefort.

“Stelia Aerospace teams and myself are very proud of this new delivery, on time, after 3 years of intense and close work between our different sites and our customer’s teams," said Cédric Gautier, CEO of Stelia Aerospace. "Our teams have once again demonstrated their ability to deliver on time a complete 'plug and play' section."

The BelugaXL, a latest generation aircraft (derived from the Airbus A330), is the successor of the current BelugaST (derived from the Airbus A300). The program was launched in November 2014, in order to address Airbus’ transport capacity requirements due to production ramp-up. In this context, the aircraft manufacturer decided to expand its existing BelugaST fleet with the development and production of five new BelugaXL aircraft, which will gradually enter into service as from 2019. After the delivery by the Méaulte plant, on 30th May, of the first nose section of the BelugaXL, fully equipped with its electric and fluid systems, and the delivery on 8th July, by the Rochefort site, of the upper fuselage section, this delivery is the third section delivered by Stelia Aerospace for the first of Airbus’ future super-transporter.

(Image provided with Stelia Aerospace news release)

FMI: www.stelia-aerospace.com

Advertisement

More News

ANN's Daily Aero-Term (10.02.25): Radar Contact Lost

Radar Contact Lost Used by ATC to inform a pilot that the surveillance data used to determine the aircraft's position is no longer being received, or is no longer reliable and rada>[...]

ANN's Daily Aero-Linx (10.02.25)

Aero Linx: International Cessna 170 Association The International Cessna® 170 Association (TIC170A) was formed in 1969. We have over 1,000 members who own more than 850 aircraf>[...]

NTSB Final Report: Powrachute LLC Airwolf

Pilot... Attempted To Enter The Right Side Of The Aircraft And Inadvertently Sat On The Throttle Control Analysis: Security camera video footage showed the pilot fuel the powered p>[...]

Aero-News: Quote of the Day (10.02.25)

"This contract represents a huge 'win' for the entire CH-53K team. The contract allows Sikorsky to bundle purchase orders from suppliers to achieve better pricing and pass the savi>[...]

Airborne 09.26.25: Army Cuts AV-Ranks, 2025 ATC Hiring, AF Next-Gen Fighter

Also: Purdue In Space?, 4 SpecOps Lost In Helo Crash, Solid-Fuel Ramjet, Ultra-High Airspace Over FL The US Army recently confirmed its plans to thin out its active duty aviation r>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC