AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jul 18, 2021

AD: The Boeing Company Airplanes

AD 2021-13-02 Requires Installation Of An Insulation Blanket Assembly

The FAA is adopting a new airworthiness directive (AD) for certain The Boeing Company Model 777-300ER series airplanes.

This AD was prompted by a report that a production design change to certain insulation blankets inadvertently opened up leakage paths for halon and smoke to escape from the aft cargo compartment in the event of a fire. This AD requires installation of an insulation blanket assembly on top of existing insulation blankets in certain areas of the forward endwall in the aft cargo compartment. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective August 19, 2021.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to certain The Boeing Company Model 777-300ER series airplanes. The NPRM published in the Federal Register on December 29, 2020 (85 FR 85557).

The NPRM was prompted by report indicating that a production design change to certain insulation blankets inadvertently opened up leakage paths for halon and smoke to escape from the aft cargo compartment in the event of a fire.

In the NPRM, the FAA proposed to require installation of an insulation blanket assembly on top of existing insulation blankets in certain areas of the forward endwall in the aft cargo compartment. The FAA is issuing this AD to address increased leakage paths, which, in the event of a fire, could result in loss of fire suppressant in the cargo compartment, and could lead to an uncontained fire and subsequent loss of the airplane.

FMI: www.regulations.gov

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC