Nimitz Completes Flight Deck Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Oct 26, 2016

Nimitz Completes Flight Deck Certification

Second Major Milestone On Way To 2017 Deployment

Aircraft carrier USS Nimitz (CVN 68) earned her flight deck certification while underway in the Pacific Ocean, Oct. 20. The certification proves Nimitz's flight deck and the Sailors who conduct flight operations are capable of safely launching and recovering aircraft.

Nimitz recently completed a 20-month extended planned incremental availability (EPIA). The certification is the carrier's second major milestone on her way to a upcoming 2017 deployment.

To certify in flight operations, the Nimitz Air Department was required to catch 50 aircraft on the first day of flight operations, 70 the following day, and 40 by the end of the second night. Nimitz had 399 catches total by the fifth day.

"The credit is all on the junior Sailors," said Petty Officer 1st Class William Dail, the arresting gear work center's leading petty officer. "Without them we would not be able to catch the aircraft."

The flight deck certification is a culmination of countless hours of work, and would not have been possible without the renovations and certifications achieved during Nimitz's recent EPIA.

While in the yards, Air Department re-certified four aircraft elevators and overhauled much of the equipment that supports flight operations including the catapults, arresting gear, safety nets, and jet blast deflectors.

During the almost two years spent pierside, Nimitz gained many new Sailors who had never seen or participated in flight operations.

"About 30-40 percent of the Sailors have never seen the flight deck (during) flight operations," said Master Chief Petty Officer Raul Ramos, Air Department's leading chief petty officer.

Sailors welcomed the chance to put all of their training and studying to the test once the ship began launching and recovering aircraft.

"All the long days, hard work, maintenance, and training in the yards finally paid off 21 months later," said Ramos. "It was a reward having the first aircraft land."

With the flight deck certified, Nimitz, her crew, and embarked Carrier Air Wing (CVW) 11 and can now look forward to continuing routine operations at sea.

(Images provided with U.S. Navy news release)

FMI: www.navy.mil/local/cvn68

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC