Boeing Australia Completes First Loyal Wingman Fuselage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Feb 13, 2020

Boeing Australia Completes First Loyal Wingman Fuselage

Three Prototype Aircraft Under Development For The Program

The Boeing Australia team recently completed major fuselage structural assembly for the first Loyal Wingman. The aircraft is one of three prototypes that will be developed as a part of the Loyal Wingman – Advanced Development Program in partnership with the Royal Australian Air Force (RAAF).

“This is an exciting milestone for the development program, and the Australian aerospace industry, as we progress with production of the first military aircraft to be developed in Australia in more than 50 years,” said Dr. Shane Arnott, program director, Boeing Airpower Teaming System (ATS).

The Australian team has applied digital engineering and advanced composite materials to achieve cost and agility goals for the 38-foot aircraft, which is designed to use artificial intelligence in teaming with other manned and unmanned platforms.

“The partnership with Boeing is key to building our understanding of not just the operational implications for these sorts of vehicles, but also making us a smart customer as we consider options for manned-unmanned teaming in the coming decade,” said Air Commodore Darren Goldie, RAAF Director-General of Air Combat Capability. “Boeing is progressing very well with its development and we look forward to seeing the final product in the coming months.”

Arnott said Australian Industry participation had been critical to the program’s rapid development, with a 16-strong Australian industry team making key deliveries to date including:

  • BAE Systems Australia, who have delivered hardware kits including flight control computers and navigation equipment
  • RUAG Australia, who have delivered the landing gear system
  • Ferra Engineering, who have delivered precision machine components and sub-assemblies to support the program; and
  • AME Systems, who have delivered wiring looms to support the vehicle.

This first Loyal Wingman prototype will provide key lessons toward production of the ATS, which Boeing Australia is developing for the global defense market. Customers will be able to tailor ATS sensors and systems based on their own defense and industrial objectives.

The next major milestone will be weight on wheels, when the fuselage structure moves from the assembly jig to the aircraft’s own landing gear to continue systems installation and functional testing. The aircraft is expected to complete its first flight this year.

(Image provided with Boeing news release)

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Patriot Aircraft LLC CX1900A

After Draining Both Wing Fuel Tanks, A Significant Amount Of Water Was Observed In The Right Wing Fuel Tank Analysis: The pilot, who was also the owner of the experimental amateur->[...]

Aero-News: Quote of the Day (12.06.25)

“Airbus apologises for any challenges and delays caused to passengers and airlines by this event. The Company thanks its customers, the authorities, its employees and all rel>[...]

ANN's Daily Aero-Term (12.06.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.06.25)

Aero Linx: Taylorcraft Foundation, Inc. The Taylorcraft Foundation is exclusively organized for charitable, educational & scientific activities and will preserve the history an>[...]

Airborne-NextGen 12.02.25: Honda eVTOL, Arctus High-Alt UAS, Samson Patent

Also: USAF Reaper Accident, Baikonur Damage, Horizon eVTOL IFR/FIKI, New Glenn Update Honda has outlined its clearest timeline yet for its entry into the world of electric vertical>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC