AeroSports Update: The Ventus-2cxa With FES Propulsion System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Aug 22, 2014

AeroSports Update: The Ventus-2cxa With FES Propulsion System

Sailplanes Are By Nature Graceful, But The New German Schempp-Hirth Ventus-2cxa With The FES Propulsion System Is Nothing Less Than Stunning

The history of gliders predates the Wright Brothers and ultimately led to their success with their first powered airplane which was a variation of their 1902 glider design. Over the years as powered aircraft took the front page news from gliders, soaring became a hobby and a recognized sport around the world.

The term glider has been changed to the term sailplane when applied to modern gliding aircraft. The technology of modern sailplanes is nothing less than spectacular and the new wave of interest is to have a high-performance sailplane that can self-launch.

Schempp-Hirth, in partnership with LZ Design, has presented their new Ventus-2cxa equipped with a Front Electric Sustainer (FES) motor. The innovative motor plus a foldable propeller are built into the glider’s nose with two batteries embedded in the fuselage. Each battery weighs 35 pounds. Testing of the FES system is continuing and comments from the company indicate that initial climb, cruise and endurance performance exceed their expectations.

Schempp-Hirth is planning to place the Ventus-2cxa equipped with LZ Design's FES propulsion system into production with first deliveries possible during the soaring season of 2015. They expect the timeline for EASA certification should not be an issue.

(Image provided by Schempp-Hirth)

FMI: www.schempp-hirth.com
 

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC