NASA Hangs In Limbo On Obama Transition | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.22.25

AirborneNextGen-
12.23.25

Airborne-Unlimited-12.10.25

Airborne-FltTraining-12.18.25

AirborneUnlimited-12.19.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Dec 23, 2008

NASA Hangs In Limbo On Obama Transition

Agency Awaits Griffin's Next Move, Constellation's Future

Widely rumored development problems with NASA's next-generation manned space program, early campaign promises by President-elect Brack Obama to trim spending on space exploration, and reports of head-butting between the transition team and Administrator Michael Griffin are causing uncertainty within NASA.

The Washington Post reports Griffin, a brilliant but confrontational rocket engineer, has said he does not expect to be retained as administrator. Questions also surround the Constellation program, including a return of US astronauts to the moon and possibly a first manned mission to Mars.

The Post reports Griffin has made it clear that he has no interest in staying if it means a significant shift in strategy. But transition team bean counters want to look at saving money by scrapping the troublesome Ares I rocket, and instead upgrading the legacy Delta IV or Atlas V to make them safe for human spaceflight.

The Post adds it has exchanged e-mails with Griffin, asking whether such a change in direction would trigger his resignation... and got, essentially, a yes.

"NASA's purpose is to produce technical solutions to achieve space policy goals enunciated from above," Griffin responded. "If agency management cannot be trusted to do that, they should be replaced. Specifying solutions from outside the agency cannot possibly work."

On the issue of resistance to working with the Obama transition team, Griffin memoed NASA employees to denounce a recent Orlando Sentinel article which described a "red-faced" confrontation with the Obama team. The transition team point person with NASA is former NASA Administrator Lori Garver.

Underlying the other controversies is Obama's early campaign position advocating a five-year delay in returning to the moon, to free up federal funding for education.

There's no shortage of passionate bloggers and internal leaks to feed the controversies at NASA in the last month of the Bush administration. But the Post reports that what will happen after January 20th is still a toss-up.

Or, as As Scott Pace, the new director of the Space Policy Institute, tells the paper, "Those who talk don't know, and those who know don't talk."

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: In Praise of Alabama’s Patriot Aircraft USA

From 2023 (YouTube Edition): "Ain’t Your Daddy’s Super Cub”—Don Wade Co-owned by Don and Ron Wade—the former of Don’s Dream Machines, a storied >[...]

NTSB Final Report: Cirrus Design Corp SR22

Pilot-Rated Passenger Reported That The Pilot Did Not Adequately “Round Out” The Landing Flare And The Airplane Bounced And Yawed To The Right Analysis: The pilot state>[...]

ANN's Daily Aero-Term (12.21.25): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (12.21.25)

Aero Linx: Lake Amphibian Club This website is created and sponsored by the Lake Amphibian Club, to help spread the word about these wonderful, versatile amphibians that can land j>[...]

Aero-News: Quote of the Day (12.21.25)

“I am deeply honored to be sworn in as NASA administrator. NASA’s mission is as imperative and urgent as ever — to push the boundaries of human exploration, ignit>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC