Foreign Growth Boosts Employment At GE Aviation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Dec 01, 2011

Foreign Growth Boosts Employment At GE Aviation

North Carolina Plants Say Hiring Will Continue Into 2012

A flurry of orders announced during the Paris and Dubai Airshows this year is bringing an uptick in employment at some GE Aviation Facilities in the US. Cathay Pacific, Air China, Republic Airways, LAN, Garuda Indonesia, Lufthansa, Emirates and Cargolux all had deals with GE announced over just three days of the Dubai show, and the manufacturer will be hiring through 2012.

In North Carolina, GE Aviation spokesman Rick Kennedy tells Star News Online the company has already added about 20 workers at its Castle Hayne plant in the last six months, and plans 10 to 15 more after the first of the year. Part of the reason the growth is expected to continue is a deal with Emirates Airlines to provide GE90 engines for 50 more Boeing 777s. GE said at the time, "The engine order list price and service agreement is valued at approximately $6 billion (USD) over the life of the contract."

The Castle Hayne plant builds parts for the GE90, and also for the GEnx powering the 787 Dreamliner, and the CFM56 used on the 737.

Just up the road in Durham, NC, Ge Aviation's plant manager there, Michael Wagner, says his facility has also seen job growth keeping up with demand for parts for engines used in the Boeing 787 and 747-8. He tells the Durham Herald-Sun that building five GEnx engines a week "is significant just because a few years ago, we weren’t shipping anything. An engine of that size for a wide body, at that rate, is a tremendous challenge for extended global supply.”

Wagner says his location has hired 70 technicians in the last year-and-a-half, and will look at hiring more in 2012.

FMI: www.geaviation.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC