The Dreamliner Roars: Boeing Completes First 787 Dreamliner Engine Runs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 22, 2009

The Dreamliner Roars: Boeing Completes First 787 Dreamliner Engine Runs

Dreamliner Converts Fuel To Noise

Is Boeing getting the 787 back on track? Judging by recent events, it sure looks like progress is being made... and on something that actually resembles a schedule... albeit a much modified one.

Regardless; it shows steady progress toward the first flight of the 787 Dreamliner, as Boeing completed the first engine runs on the all-new airplane, Thursday morning. The occasion marks the first all-electric start of a commercial jetliner engine on a commercial jetliner; the engines had been started electronically in test facilities earlier.

Engine runs began at 9:30 a.m. (PDT) today and ended 40 minutes later. During initial engine runs, the engines are started and operated at various power settings to ensure all systems perform as expected. Today's engine run test began with the Auxiliary Power System providing power to start the two Rolls-Royce Trent 1000 engines.

Basic systems checks continued throughout the test. The engines were powered down and inspected and will be restarted following a technical review. The team completed a vibration check and monitored the shutdown logic to ensure it functioned as expected.

"We were very pleased with the performance on the engines during this test," said Scott Fancher, vice president and general manager of the 787 program. "We will now get ready for our intermediate and final gauntlet tests."

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC