First Flight: Boeing P-8A Poseidon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Apr 28, 2009

First Flight: Boeing P-8A Poseidon

Boeing's P-8A Poseidon test aircraft T-1 successfully completed its first flight April 25th, taking off from Renton Field at 10:43 a.m. and touching down at Boeing Field in Seattle at 2:14 p.m. The P-8A performed a series of flight checks, reached a maximum altitude of 25,000 feet, and landed after three hours, 31 minutes in the air.

"This is a significant accomplishment for the P-8A team, as it moves us one step closer to delivering the next maritime patrol and reconnaissance aircraft to the warfighter," said Capt. Mike Moran, P-8A program manager for the U.S. Navy.

"Today's flight is a clear demonstration of the program's commitment to delivering this critical capability on time and the result of a tremendous effort by the joint Navy/Boeing team. I commend Boeing for putting its 'A-Team' in place on this program and enabling the Navy to leverage Boeing's experience, expertise and, more importantly, dedication to make this aircraft a reality."

Prior to takeoff, the P-8A team completed a limited series of flight checks, including engine starts and shutdowns. During the flight, test pilots performed airborne systems checks including engine accelerations and decelerations, autopilot flight modes, and auxiliary power unit shutdowns and starts.

"This is an exciting day for the P-8A program and a tribute to the hard work of the entire team," said Bob Feldmann, Boeing vice president and P-8 program manager. "We understand the needs of the U.S. Navy and maritime patrol community, and we are dedicated to meeting every one of our future milestones on or ahead of plan."

The integrated Navy/Boeing team will begin formal flight testing of the P-8A during the third quarter of this year. Before that, Boeing will paint the aircraft, install additional flight test instrumentation and conduct a series of ground tests.

The P-8A, a derivative of the Next-Generation 737-800, is built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems and GE Aviation. The team currently is assembling and testing the first five P-8As.

The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is planned for 2013.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC