AeroSports Update: Sling Airplane To Be Built In 4 Days | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Sep 18, 2014

AeroSports Update: Sling Airplane To Be Built In 4 Days

The Sling 4-4-40 Challenge Has Started And 40 Workers Will Attempt To Build And Fly A Sling 4 In Just 4 Days!

A team of 40 workers from The Airplane Factory, including admin, catering, and marketing staff, will attempt to build and fly a Sling 4 in four days! The build will take place at the 2014 Africa Aerospace and Defense Expo at the Waterkloof Air Force Base in South Africa. The project started yesterday and is planned to be completed on Saturday, September 20th.

The team will work around the clock, with the day and night being split into 10 and 14 hour shifts, respectively. The build processes and procedures will essentially follow the same pattern as they do when a plane is built at the factory, but there will be two teams working on an airframe sub-assembly at a time instead of one. At the same time, the electrical, upholstery, and engine installation teams will work on their respective projects. All will come together on day three, just in time for the final assembly team to work through the night in preparation for a test flight on Saturday afternoon.

This is not the first time that The Airplane Factory has undertaken such an exciting project. Back in 2011, the Sling 5577 Challenge took place, in which 5 men from the factory and 5 women who never had touched a rivet gun built a Sling 2 in 7 days. It then took an additional 7 to fly the aircraft from Johannesburg to Poland, where it was delivered to an eager customer.

FMI: www.facebook.com/TheAirplaneFactory
 

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC