NASA Awards Contract to Modify Kennedy's Vehicle Assembly Building High Bay 3 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Mar 07, 2014

NASA Awards Contract to Modify Kennedy's Vehicle Assembly Building High Bay 3

Florida Company Will Help Ready The Facility For SLS Assembly

NASA has selected Hensel Phelps Construction Co., of Orlando, FL, to modify High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida for the processing of the agency's Space Launch System (SLS) rocket.

Hensel Phelps will receive a fixed-price contract for $99.57 million, consisting of the base amount and three options. The period of performance is 782 calendar days, or about 2 years and one month. The potential maximum value of this contract is $112.70 million, if additional awarded options are exercised.

Contract services include all required management, labor, facilities, materials and equipment, other than government furnished equipment, to modify the VAB and construct new vehicle access platforms and related systems for the SLS. The work consists of removing, modifying or reusing current structural component systems, and constructing and installing new structural, mechanical and electrical material, systems and equipment.

The work done on this contract will support Kennedy's Ground Systems Development and Operations (GSDO) Program. Building on five decades of launch and processing excellence, GSDO is transforming Kennedy into a multi-user spaceport capable of accommodating a wide array of government and commercial space activities.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC