NASA, Boeing Sign Space Launch System Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jul 04, 2014

NASA, Boeing Sign Space Launch System Contract

Agreement Reached As Core-Stage Critical Design Review Closes

NASA has finalized a contract with Boeing to develop the core stage of the Space Launch System (SLS), the most powerful rocket ever built and destined to propel America’s return to human exploration of deep space.

The $2.8 billion contract validates Boeing’s earlier selection as the prime contractor on the SLS core stage, including the avionics, under an undefinitized contract authorization. In addition, Boeing has been tasked to study the SLS Exploration Upper Stage, which will further expand mission range and payload capabilities.

The agreement comes as NASA and the Boeing team complete the Critical Design Review (CDR) on the core stage – the last major review before full production begins.

"Our teams have dedicated themselves to ensuring that the SLS – the largest ever -- will be built safely, affordably and on time,” said Virginia Barnes, Boeing SLS vice president and program manager. “We are passionate about NASA’s mission to explore deep space. It’s a very personal mission, as well as a national mandate.”

During the CDR, which began June 2, experts examined and confirmed the final design of the rocket’s cryogenic stages that will hold liquefied hydrogen and oxygen.  This milestone marks NASA’s first CDR on a deep-space human exploration launch vehicle since 1961, when the Saturn V rocket underwent a similar design review as the United States sought to land an astronaut on the moon. Boeing participated in that CDR as well, as the three stages of the Saturn V were built by Boeing and its heritage companies Douglas Aircraft and North American Aviation.

Scheduled for its initial test flight in 2017, the SLS is designed to be flexible and evolvable to meet a variety of crew and cargo mission needs. The initial flight-test configuration will provide a 77-ton capacity, and the final evolved two-stage configuration will provide a lift capability of more than 143 tons. 

(NASA artist's concept of SLS launch from file)

FMI: www.nasa.gov. www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC