Space Shuttle's Final Flight Tank Spliced Together | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Mar 04, 2010

Space Shuttle's Final Flight Tank Spliced Together

Tank Will Fly On STS-133 In September

As the Space Shuttle program winds down, we're going to see a lot of these kinds of stories over the next few months. The program's final flight tank - designated External Tank-138 - has completed a critical production milestone at the NASA Michoud Assembly Facility. The tanks are built by Lockheed Martin in New Orleans, where its engineers and technicians mechanically spliced ET-138's liquid oxygen (LO2)/intertank to the liquid hydrogen (LH2) tank, thus producing "a whole tank" for the first time in the production process.

The work is performed in Cell A in the 20-story-tall Vertical Assembly Building, and is the only time during production that the tank is standing upright. Workers also completed foam closeouts on the LH2 to intertank flange.

An External Tank is actually three components in one. The 54.6-foot-tall bullet-shaped LO2 tank sits at the top. The 22.5-foot-long intertank separates the LO2 tank and the LH2 tank and does not hold fuel. Unpressurized, the intertank serves as the forward attachment point for the Solid Rocket Boosters. The bottom vessel is the 96.7-foot-tall LH2 tank. The LO2 tank and intertank are already spliced together when they enter Cell A.

Lockheed Martin employees loaded the tanks into the cell and completed the splicing and laydown of the tank in a record 40 days. The prior eight tanks averaged 60 days in Cell A.

ET-138 now proceeds to the Final Assembly area for more processing and is scheduled for completion June 29. When ET-138 is delivered to NASA, it will be 15 stories tall (154 feet), nearly 28 feet in diameter, and weigh 58,500 pounds empty. When filled with 534,000 gallons of propellant on the launch pad, the tank will weigh nearly 1.7 million pounds. ET-138 is scheduled to launch with Space Shuttle Discovery (STS-133) on September 16 -- the final shuttle launch of the 29-year program. ET-138 will help propel Discovery to orbit and then separate from the shuttle 81/2 minutes post-launch after Main Engine Cut-off or MECO.

FMI: www.lockheedmartin.com, www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.01.24): Say Altitude

Say Altitude Used by ATC to ascertain an aircraft's specific altitude/flight level. When the aircraft is climbing or descending, the pilot should state the indicated altitude round>[...]

ANN's Daily Aero-Linx (05.01.24)

Aero Linx: European Air Law Association (EALA) EALA was established in 1988 with the aim to promote the study of European air law and to provide an open forum for those with an int>[...]

Classic Aero-TV: Korean War Hero Twice Reborn

From 2023 (YouTube Version): The Life, Death, Life, Death, and Life of a Glorious Warbird In 1981, business-owner Jim Tobul and his father purchased a Chance-Vought F4U Corsair. Mo>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC