New Tower To Be Built At Canada's Waterloo International Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, Jun 09, 2015

New Tower To Be Built At Canada's Waterloo International Airport

NAV CANADA To Build The New Structure, Replacing 45-Year-Old Facility

A new air traffic control tower will be built by NAV CANADA at the Region of Waterloo International Airport. The new structure will replace the existing tower built over 45 years ago. Work is set to begin this month and is anticipated to be completed by the summer 2017.

"The new tower will be significantly taller than what we have today. The added height will improve controllers' sightlines to all the airport's runways, taxiways and aprons," says Rudy Kellar, NAV CANADA Executive Vice President, Service Delivery. "The tower cab will be larger and provide controllers with a 360-degree view of the airfield."

At 64 feet tall, the new tower will be almost 16 feet taller than the present structure. The larger cab will expand the controllers' workspace to 3345 square feet. The four story building will have an elevator.

"This new facility will be well suited for the existing traffic and will meet the future needs of our airport," said said Ken Seiling, Waterloo Regional Chair.

"The Region of Waterloo International Airport is an important gateway for the region and I am pleased that NAV CANADA is making this significant investment in the airport," says the Honourable Lisa Raitt, Minister of Transport. "These types of investments in our aviation infrastructure will benefit both residents and businesses in the area."

"The current tower was built in 1969," notes Kellar. "At that time it was situated near the centre of the airport. Since then, runway 08/26 has been extended a further 3,300 feet to the east which put the centre well east of the tower's location."

The new facility will also feature much needed office space, a conference room, a fitness room, a quiet lounge, a lunch room and a training classroom. For controllers working in the cab there will be three new ergonomically designed consoles.

(Artists rendering provided by NAV CANADA)

FMI: www.navcanada.ca

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC