NTSB Makes ATR-42 Stick-Pusher Recommendations To FAA, EASA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jun 28, 2012

NTSB Makes ATR-42 Stick-Pusher Recommendations To FAA, EASA

Move Tied To An Accident Which Occurred In 2009

Following the investigation into an accident which occurred on January 27th, 2009, in which an ATR 42 went down on final approach to Lubbock, TX in icing conditions, the NTSB determined that the stall-prevention system on the airplane was a contributing factor to the accident. The board also cited poor airspeed management on the part of the pilots of the cargo flight, both of whom survived the accident.

Flight Global reports that the letter sent by the NTSB to both regulatory agencies points out that the stall prevention system in the ATR-42 did not require a stick pusher function for certification of the airplane, the board "has long recognized that the certification standards do not capture real-world icing conditions."

The Board has recommended to both the FAA and EASA that they require that Avions de Transport Régional (ATR) 42-series airplanes operating in the United States incorporate a revised stickpusher activation angle of attack (AOA), such that the stick pusher activates before the stall AOA in the presence of airframe ice accretions.

It goes on to recommend that all U.S.- and European-certificated transport-category airplanes equipped with stick pushers be evaluated to ensure that the stick pusher activates at an angle of attack that will provide adequate stall protection in the presence of airframe ice accretions. (ATR-42 photo from file)

FMI: www.ntsb.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC