FAA Set To Open More Grand Canyon Air Tour Slots | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Feb 11, 2014

FAA Set To Open More Grand Canyon Air Tour Slots

Flights Will Be Restricted To Operators Using 'Quiet Technology'

The FAA is set to open up 1,721 flight allocations for Grand Canyon tour flights that it had abandoned in the past, as long as the flights do not increase the overall noise in the park.

The Associated Press reports that the Transportation bill passed in 2012 required the FAA and National Park Service to develop incentives for the use of "quiet air technology" (QT) at the Grand Canyon. The Park Service has already reduced the fee per flight from $25 to $20 for such aircraft. A formula that accounts for noise certification levels and number of seats is used to determine if an aircraft can be considered "quiet."

A notice posted in the Federal Register last week states "This is a one-time release of FAA-held allocations that will be available to operators for quiet aircraft technology flights during the 2014 air tour season and beyond. The FAA and NPS are continuing to make progress on additional quiet aircraft technology incentives for commercial air tour operators in Grand Canyon National Park."

The Federal Register indicates that the FAA currently holds 49 allocations in the Dragon and Zuni Point corridors of the park and 1,672 allocations elsewhere in the park Special Flight Rules Area (SFRA) that it intends to release to commercial air tour operators that currently hold allocations in proportion to the number of QT operations that are flown by the respective operators in these areas during the first six months of calendar year 2014. These allocations are within the total annual number that are authorized to be flown in the Dragon and Zuni Point corridors and elsewhere in the SFRA, respectively, under 14 CFR Part 93, Subpart U. They will be used for operations using QT, as defined in Appendix A of 14 CFR Part 93, Subpart U.

FMI: Federal Register Notice

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC