Second Gulfstream G150 Starts Flight Test -- Two Weeks Ahead Of Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Sep 10, 2005

Second Gulfstream G150 Starts Flight Test -- Two Weeks Ahead Of Schedule

G150 Serial Number 202, Logs More than Five Flight Hours on Maiden Flight

Gulfstream Aerospace has added a second G150 business-jet test aircraft to its flight test program – two weeks ahead of schedule. Gulfstream’s newest business jet, the Gulfstream G150, is expected to enter service in the third quarter of 2006.
 
The second production G150 aircraft, serial number 202, completed its first flight Sept. 2 in Tel Aviv, Israel , flying 5 hours, 30 minutes. During the flight, all aircraft systems were cycled and the test aircraft reached a maximum altitude of 45,000 feet and flew at a maximum speed of Mach 0.865. Gulfstream will use this second aircraft for function and reliability testing, which started on Sunday, September 4.

“The pilots reported G150, serial number 202, flew flawlessly during its maiden flight,” said Pres Henne, senior vice president, programs, engineering and test, Gulfstream.

“Like the first G150 test plane, serial number 201, this second test plane impressed us with its outstanding performance qualities. The G150 is proving to be quite a business jet.”

The first G150 flight-test aircraft, serial number 201, has flown some 70 flights, accumulating more than 250 flight hours since its first flight on May 3 of this year. The aircraft’s dispatch reliability has enabled pilots to fly two test flights per day on many of the days the aircraft has been scheduled to fly. The average flight duration has been more than 3 ½ hours per flight.

Gulfstream and Israel Aircraft Industries (IAI) are developing the wide-cabin, high-speed G150 business jet. It is being built through its Certificate of Airworthiness at IAI’s facility in Tel Aviv and then flown to Gulfstream’s Dallas completions facility for its final phase of manufacturing.

The G150 remains on schedule for type certification in the first quarter of next year. To offer customers a better look at the G150, Gulfstream developed a true-to-size replica of the G150 cabin and cockpit that is currently being displayed in cities throughout the United States.

FMI: www.gulfstreamg150.com

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC