Government Wins Case on Cancelled Navy Contract for A-12 Stealth Attack Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, May 07, 2007

Government Wins Case on Cancelled Navy Contract for A-12 Stealth Attack Aircraft

Someone Owes Uncle Sam A LOT Of Moolah

The US Court of Federal Claims has upheld the Navy's termination for default of a contract with McDonnell Douglas and General Dynamics for the A-12 stealth attack aircraft.

In 1988, the Navy awarded the $4 billion fixed-price contract for development of the A-12, which was to be a stealthy, carrier-based attack aircraft. The program encountered serious technical difficulties, and in 1991, then Secretary of Defense Dick Cheney terminated the A-12 program because it was substantially over budget and behind schedule. The Navy subsequently terminated the contract for default, without ever receiving a single plane.

The contractors challenged the termination, resulting in 16 years of litigation. The court originally overturned the termination, holding that then Secretary of Defense Cheney had wrongfully terminated the A-12 program over the Navy's objections. Following two appeals, the court held that the Navy had properly terminated the contract for default.

"We are gratified by the court's decision, which explains why the Navy was within its rights to terminate the contract for default and protect the American taxpayer's interests, and hopefully will bring this long litigation closer to resolution," said Deputy Assistant Attorney General Michael F. Hertz.

Unless the judgement is overturned on appeal, the contractors will be required to return to the government payments of about $1.35 billion, plus interest, a sum which currently exceeds $2.6 billion.

FMI: www.usdoj.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC