FAA To Hilton Head: Runway Less Than 5,000 Feet Not Worth The Cost | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Oct 14, 2010

FAA To Hilton Head: Runway Less Than 5,000 Feet Not Worth The Cost

A 700 Foot Extension Would Preserve Existing commercial Service

The FAA has told Hilton Head Island airport (KHXD) officials that any proposal to extend the runway on the resort island to less than 5,000 feet would receive a cool reception from the agency, and would be difficult to justify in terms of funding.

In a letter sent to county administrator Gary Kubic, the FAA's Scott Seritt said that an extension of less than 700 feet "would not justify the cost."

The argument is a familiar one pitting residents living near the airport against the airports' desire for a longer runway. The Island Packet reports that consultants studied extensions of 300, 700, and 1,100 feet, and some town officials have said that the 700 foot option would preserve the turboprop-based commercial service to the airport, increasing safety for those aircraft while minimizing disruptions to the surrounding residential neighborhoods. But the 5,000 foot runway would still not be sufficient for larger business jets or regional jets operated by the airlines. Regional jets would require a runway of at least 6,500 feet.

The FAA seems to be pushing Hilton Head to go for the longest option studied, a 5,400 foot runway. Seritt said in his letter that if the county does not make the longest possible extension now, the funds for such projects might not be available in the future.


KHXD

The paper reports that county administrator Kubic said the likelihood of reduced federal funding for the shortest option make it "very unlikely," and that a 5,000 foot runway seemed to be a good compromise. He said that the airport does not generate enough revenue to undertake any runway extension without the 95 percent funding offered by the FAA. State and local sources split the remaining 5 percent.

FMI: http://bcgov.net/about-beaufort-county/transportation/hhi-airport/index.php, www.faa.gov

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC