P-8A Passes Initial Operational Test And Evaluation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Jul 10, 2013

P-8A Passes Initial Operational Test And Evaluation

Key Milestone Will Influence Full-Rate Production Decision

After an extensive testing period, the U.S. Navy announced July 1 in an Initial Operational Test and Evaluation report that its new patrol and reconnaissance aircraft, P-8A Poseidon, was found “operationally effective, operationally suitable, and ready for fleet introduction.”

“This milestone and accomplishment is possible due to the great team of individuals who worked diligently and meticulously in making this aircraft the best choice to replace the Navy’s current workhorse, the P-3C Orion,” said Capt. Scott Dillon, Maritime Patrol and Reconnaissance Aircraft Program Office (PMA-290) program manager. “It is a great day for the Navy and the fleet. We are proud to add the P-8 to the Navy’s weapons inventory and the deployment cycle later this year.”

This announcement of completing IOT&E follows another major program milestone last month, the successful firing of the Harpoon from the P-8A, which resulted in a successful target strike.
 
“On June 24, completing just one practice run at the Point Mugu Sea Test Range, a P-8A Poseidon from Pax River achieved a program milestone after six minutes of flight time,” Dillon said. “The P-8A successfully launched a Harpoon AGM-84D Block IC missile on the first hot run scoring a direct hit run on a Low Cost Modular Target. This flight test, along with past tests, demonstrates the P-8’s operational effectiveness and overall mission capabilities.”
 
The successful completion of the initial operational testing period was a key milestone that will inform the full-rate production decision. With the program passing IOT&E, the P-8A program continues to be on track for an initial operational deployment this winter when the first P-8A squadron will deploy with P-3 and EP-3 squadrons.
 
To date, nine low rate initial production aircraft have been delivered to the fleet and six test aircraft have been delivered to NAVAIR. According to the program of record, the Navy plans on purchasing 117 P-8As aircraft.

(U.S. Navy image.)

FMI: www.navair.navy.mil

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC