First F135 Engine Delivered For Low Rate Initial Production Lot 3 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.21.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, May 10, 2011

First F135 Engine Delivered For Low Rate Initial Production Lot 3

Twenty-First Production Engine Of The Program Includes Mods From Flight Testing

Pratt & Whitney has delivered the first F135 engine for low rate initial production (LRIP) Lot 3 to the U.S. Government for the F-35 Lightning II program. F135 engines in LRIP 3 meet established affordability targets and include engine modifications and improvements based on findings from the F-35 flight test program.

"Delivery of our 21st production engine is a significant milestone for the F-35 program, as we continue to deliver a more mature and capable F135 engine to meet the evolving needs of the war fighter," said Bennett Croswell, vice president, F135/F119 Engine Programs. "In doing so, we continue reducing costs to produce a more affordable and reliable product for our customers."

As part of LRIP 3, Pratt & Whitney will begin delivery of F135 engines to all three branches of the U.S. Armed Forces, as well as F-35 partner countries the United Kingdom and The Netherlands. Pratt & Whitney has delivered all 20 of the F135 engines in LRIP 1 and 2.

FMI: www.pratt-whitney.com

Advertisement

More News

Samson Sky Hits the Wind Tunnel

Improvements Stack as Brand Readies for Mass Production Samson Sky updated followers on its flying car progress, describing some of the travails of the wind tunnel as they get clos>[...]

ANN's Daily Aero-Term (05.22.24): LAHSO

LAHSO An acronym for “Land and Hold Short Operation.” These operations include landing and holding short of an intersecting runway, a taxiway, a predetermined point, or>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (05.19.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Branch was founded in 1951 as the first constituent organization of the Aerospace Medical Association (AsMA). In 2006>[...]

ANN's Daily Aero-Term (05.19.24): Back-Taxi

Back-Taxi A term used by air traffic controllers to taxi an aircraft on the runway opposite to the traffic flow. The aircraft may be instructed to back-taxi to the beginning of the>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC