Boeing Breaks Ground In St. Louis For New Composites Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Dec 18, 2014

Boeing Breaks Ground In St. Louis For New Composites Center

Facility To Support 777X Work And Future Opportunities

Construction is underway in St. Louis for a new 367,000-square-foot facility in which Boeing will build parts for the newest member of its 777 commercial airplanes family, the 777X.

About 700 new jobs will be created for the 777X work. Construction should be complete in 2016, with work on 777X wing and empennage parts starting in 2017. The facility is an expansion of Boeing’s current tooling center at the site and will contain six autoclaves.

“As we move forward with construction of our new center, we will significantly enhance our aerospace composite capability in St. Louis, positioning us for today’s opportunities, and tomorrow’s,” said Bob Ciesla, vice president, Boeing Military Aircraft Cross-Enterprise Design/Build. “This is a tremendous opportunity for Boeing St. Louis and the entire region, which enables us to bridge to the future as a site with both commercial and defense capabilities.”

Boeing’s St. Louis site, which marked its 75th anniversary this year, is renowned for military aircraft production. More than 12,000 fighter jets have been built there and the site is headquarters for the Boeing Defense, Space & Security business unit. As of Dec.1, the company had about 15,000 employees in Missouri.

Earlier this year, Boeing selected its Everett, Wash. site as the location for a new composite wing center for the 777X program. In this wing center, Boeing will perform fabrication and assembly of the 777X’s composite wing. Additionally, Boeing will perform final assembly of the 777X in Everett.

There will be two 777X models – the 777-8X, with approximately 350 seats and a range capability of more than 9,300 nautical miles; and the 777-9X, with approximately 400 seats and a range of more than 8,200 nautical miles. The 777X has 300 orders and commitments from six customers worldwide. First delivery is targeted for 2020.

(Image from file)

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC