AD: Cessna | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jul 15, 2004

AD: Cessna

AD NUMBER: 2004-14-20
MANUFACTURER: Cessna
SUBJECT: Airworthiness Directive 2004-14-20
SUMMARY: The FAA supersedes Airworthiness Directive (AD) 2003-21-07, which applies to certain The Cessna Aircraft Company (Cessna) Model 525 airplanes. AD 2003-21-07 currently requires you to disengage the pitch trim circuit breaker and AP servo circuit breaker and then tie strap each of them to prevent them from being engaged. Not utilizing this equipment prevents a single-point failure. This AD is the result of Cessna having now developed and made changes in the design of the affected trim printed circuit board (PCB) assembly to allow the use of the assembly and the prevention of the single-point failure, and identification of additional airplanes that have the same unsafe condition. Consequently, this AD requires you to remove and replace an old trim PCB assembly with a new design assembly or modify an old trim PCB assembly to the new design. We are issuing this AD to correct this single-point failure in the electric pitch trim system, which will result in a runaway pitch trim condition where the pilot could not disconnect using the control wheel autopilot/trim disconnect switch. Failure of the electric trim system would result in a large pitch mistrim and would cause excessive control forces that the pilot could not overcome.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20041420

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC