Gulfstream G280 Meets 'Stringent' Noise Standards | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Mar 05, 2021

Gulfstream G280 Meets 'Stringent' Noise Standards

Update Is Reflected In The G280’S Aircraft Flight Manual

Gulfstream Aerospace is reporting that that the FAA has confirmed that the super-midsize Gulfstream G280 meets the certifying organization’s recently intensified noise standards.

Known as Stage 5, the standard lowers the noise limit for subsonic aircraft. The G280’s noise emissions have reportedly always fallen below the levels now classified as Stage 5.

“The Gulfstream team continues its commitment to the future of the G280 program, ensuring adherence to the most stringent standards, whether for safety, performance or noise emissions,” said Mark Burns, president, Gulfstream. “Aircraft noise abatement goals are vital to ensuring the livelihood of the aviation and aerospace industries and demonstrating our efforts to be good neighbors to those who live or work near airfields, airports or flight paths.”

Official approval to the Stage 5 noise standard ensures continued operational flexibility at noise-sensitive airports and those with time-of-day entry restrictions.

This update is reflected in the G280’s aircraft flight manual, with new noise data sheets being issued to operators.

FMI: www.gulfstream.com, www.generaldynamics.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC