AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jan 02, 2016

AD: Airbus Airplanes

AD NUMBER: 2015-25-06

PRODUCT: Certain Airbus Model A300 B2-1C, B2-203, B2K-3C, B4-103, B4-203, B4-2C airplanes; Model A310 series airplanes; Model A300 B4-600 series airplanes; and Model A300 B4-600R series airplanes.

ACTION: Final Rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2010-06-04, for the products listed above.

AD 2010-06-04 required repetitive inspections to detect cracks of the pylon side panels (upper section) at rib 8; and corrective actions if necessary.

This new AD continues to require repetitive inspections for cracking of the pylons 1 and 2 side panels (upper section) at rib 8 with reduced compliance times, and corrective actions if necessary. This AD also requires repetitive post-repair and post-modification inspections and repair if necessary.

This AD also removes certain airplanes having a certain modification from the applicability. This AD was prompted by reports of cracks found on pylon side panels at rib 8 and a fleet survey and updated fatigue and damage tolerance analyses.

The FAA is issuing this AD to detect and correct cracking of pylon side panels (upper section) at rib 8, which could lead to reduced structural integrity of the pylon primary structure, which could cause detachment of the engine from the fuselage.

DATES: This AD becomes effective February 2, 2016.

FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC