Farnborough '08: Northrop Grumman Takes KC-X Fight To England's Shores | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jul 15, 2008

Farnborough '08: Northrop Grumman Takes KC-X Fight To England's Shores

Notes It Will Complete Four Tanker Airframes In 2009; Two Ready For Mods Now

Northrop Grumman Corporation's Tanker team announced Monday in Farnborough all four KC-45A initial tanker System Design and Development (SDD) airframes are scheduled for final assembly and initial flight testing by the end of 2009. The first two SDD airframes have been built and flown, and are awaiting modification to the tanker configuration... marked progress, compared to Boeing's KC-767 also vying for the oft-contested US Air Force KC-X tanker contract.

"As we've always said, Northrop Grumman is ready now; and having all four SDD airframes ready next year shows our commitment to the US Air Force, the Department of Defense and our Airmen who are currently forced to fly 50-year-old tankers," said Paul Meyer, Northrop Grumman vice president and general manager of Air Mobility Systems. "While our competitor still has not built the tanker or boom system they offered -- our configuration is built, tested and flying now -- and has been selected by four other allied nations. Clearly our tanker is superior, offering better fuel efficiency, greater fuel offload and much lower risk. It's won all five competitions against the 767."

As ANN reported, the Department of Defense opted last week to reopen bidding on the USAF tanker contract a second time, stripping a February 29 win from the team comprised of Northrop Grumman and EADS. That ruling followed a Government Accountability Office recommendation, that found the Air Force's selection process was flawed in a number of key areas... and appeared to show preferential treatment towards the KC-45A.

Northrop says the first SDD airframe completed final assembly and conducted first flight in 2007, while the second KC-45 airframe performed first flight in May 2008. The initial KC-45 contract calls for four SDD aircraft before transitioning to Initial Low Rate Production.

"New tankers are needed now, and our team is ready now," Meyer added. "The Air Force selected the KC-45, the only system that is ready to replace the aging tanker fleet and ensure our Airmen have the very best tanker available -- and we're confident we will be selected again."

Northrop Grumman's tanker is based on the Royal Australian Air Force's KC-30B Multi-role Tanker Transport, which is on schedule for delivery in 2009. The United States is the fifth straight country to select the A330-based tanker.

FMI: www.northropgrumman.com/

 


Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC