AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Sep 22, 2017

AD: Airbus Airplanes

AD NUMBER: 2017-19-12

PRODUCT: All Airbus Model A300 series airplanes; Airbus Model A300 B4-600, B4-600R, and F4-600R series airplanes, and Model A300 C4-605R Variant F airplanes (collectively called Model A300-600 series airplanes); and Airbus Model A310 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2014-13-17, which applied to the aircraft listed above.

AD 2014-13-17 required repetitive functional tests of the circuit breakers for the fuel pump power supply, and replacement of certain circuit breakers.

This new AD requires installation of fuel pumps having a new standard, which terminates the repetitive functional tests. This AD was prompted by our determination that installation of a newly developed fuel pump standard will better address the unsafe condition.

COST: The FAA estimates  affects 128 airplanes of U.S. registry.

The actions required by AD 2014-13-17 and retained in this AD take about 1 work-hour per product, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the actions that are required by AD 2014-13-17 is $85 per product, per inspection cycle.

The FAA also estimates that it will take up to 21 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts cost per product is not available. Based on these figures, the estimated  cost of this AD on U.S. operators to be up to $228,480, or up to $1,785 per product.

DATES: This AD is effective October 24, 2017.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC