SPACEHAB Looks Ahead To STS-121 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sun, May 01, 2005

SPACEHAB Looks Ahead To STS-121

Atlantis Module Passes Astronaut Review

SPACEHAB says its hardware, commercially developed and now destined for the International Space Station (ISS), has successfully passed the final STS-121 astronaut review.

As SPACEHAB is providing its Integrated Cargo Carrier (ICC) system on the STS-121 mission scheduled for mid-July, the Company was also requested to design and fabricate a custom mounting plate, or Flight Support Equipment (FSE), which would enable two pieces of critical hardware to be attached to SPACEHAB's ICC for transfer to the ISS for their future use. 

Several crew members of the STS-121 mission will be conducting Extra Vehicular Activities (EVAs), or 'space walks', to transfer the hardware from Atlantis' payload bay to the ISS. These astronauts visited SPACEHAB Headquarters today for a training session on the flight hardware components. Mission Specialist Piers Sellers and Mission Specialist Michael Fossom inspected the flight unit and then simulated the maneuvers they will perform to remove the critical hardware from the FSE while on orbit. 

A more comprehensive training exercise was successfully completed in February when the same crewmembers performed these and other STS-121 EVA maneuvers while submerged in the Neutral Buoyancy Laboratory, NASA's large training pool that replicates the weightlessness of space. SPACEHAB also designed and fabricated the FSE training units that were used for these underwater EVA simulations. 

And on this, NASA's eighteenth mission to the ISS and SPACEHAB's seventh, the Company has yet another hardware payload manifested for flight -- the deployable SHOSS Box. Carrying spare parts, this spacious stowage box will also be transferred to the ISS during the 11-day mission. On April 21, crewmembers visited the SPACEHAB Payload Processing Facility in Florida for their first look at the SHOSS Box mounted atop the ICC. The astronauts are scheduled to return one last time in mid-May to perform their final walk-down of all of the hardware integrated onto the ICC.

FMI: www.spacehab.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC