Boeing Completes P-8A Poseidon Loads Calibration Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.03.24

Airborne-NextGen-06.04.24

Airborne-Unlimited-06.05.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Sun, Mar 22, 2009

Boeing Completes P-8A Poseidon Loads Calibration Testing

Trials Performed Ahead of Schedule

Boeing last week completed loads calibration testing of the first P-8A Poseidon test aircraft, two weeks ahead of schedule. Loads calibration is one of the prerequisites for the US Navy flight clearance process.

During the tests, up to 80 percent of the highest expected flight loads were applied to the aircraft's fuselage, horizontal stabilizers, vertical fin and wing structures. Completion of loads calibration ensures that test aircraft T-1 is ready for airworthiness testing, which will commence later this year.

"One of the reasons we were able to complete the tests ahead of schedule is that the team incorporated some new technologies which enabled us to capture more accurate and more usable data faster," said Mark Magnuson, Boeing P-8A Structural Development and Certification director. "We also completed a number of independent reviews of the test plan prior to the start of testing, in order to reduce risk."

One of the new technologies, optical photogrammetry, entailed installing small video cameras on the P-8A's leading and trailing edges and underneath the fuselage. The measurement system provided three-dimensional, real-time data.

The team now will restore T-1 to its flight configuration and perform additional systems tests prior to first flight.

The P-8A is built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems and GE Aviation. The team currently is assembling and testing the first five P-8As, based off Boeing's 737-800 commercial airliner.

The Navy plans to purchase 108 P-8A long-range maritime reconnaissance and anti-submarine warfare aircraft to replace its fleet of P-3C Orions. Initial operational capability is slated for 2013.

As ANN reported, last week the US State Department approved the sale of three P-8I derivatives to the Indian navy -- the first of what Boeing hopes will be more international orders for the surveillance plane.

FMI: www.boeing.com/ids

Advertisement

More News

Airborne 06.05.24: Yakstars Midair, Electra eSTOL Test, Space Tour No-Go

Also: Aerox 'Cylinder Sentinel', Annual TBM Reunion, Hubble Pause, Utah AAM A combined Spanish-Portuguese aerobatic demo team suffered a fatality at the Beja AirShow, when one of t>[...]

Classic Aero-TV: Aviation Prop Masters--Hartzell Composite Props for the KingAir

From 2019 (YouTube Version): Hartzell Propeller Secures STC For King Air Propellers Hartzell Propeller has secured an FAA Type Certificate for a new five-blade carbon fiber propell>[...]

Aero-News: Quote of the Day (06.03.24)

"Starship’s third flight test made tremendous strides towards a future of rapidly reliable reusable rockets. The test completed several exciting firsts, including the first S>[...]

ANN's Daily Aero-Linx (06.03.24)

Aero Linx: Utah Back Country Pilots Association (UBCP) We hope to promote flying in Utah, and we welcome you to our state. We recognize the inherent hazards and risk involved in ba>[...]

ANN's Daily Aero-Term (06.03.24):Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC