NASA: Atlantis Hail Damage Inspection and Repairs Continue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Mar 19, 2007

NASA: Atlantis Hail Damage Inspection and Repairs Continue

Space Shuttle Atlantis, surrounded by service platforms in highbay 1 inside the Vehicle Assembly Building, continues to undergo inspection for hail damage. Special scaffolding and access platforms have been erected to allow for the mapping and inspection of the external fuel tank. Repair methods and criteria are also being developed.

Repairs to the orbiter thermal protection system tiles are nearly complete and technicians are preparing to conduct non-destructive evaluation of the vehicle's reinforced carbon carbon panels on the left wing leading edge using thermography equipment.

Shuttle Program managers plan to meet next week to assess the damage and repair status to the external tank.

Mission STS-117 to the International Space Station will be scheduled sometime after a Russian Soyuz spacecraft returns from the station. The Soyuz is delivering new station crew members and returning others to Earth in late April. Adequate time is needed between the Soyuz undocking and the shuttle's arrival to the station.

During the 11-day mission, the six-member crew will install a new truss segment, retract a set of solar arrays and unfold a new set on the starboard side of the station. Lessons learned from two previous missions will provide the astronauts with new techniques and tools to perform their duties.

Atlantis Commander Rick Sturckow, Pilot Lee Archambault and Mission Specialists Jim Reilly, Patrick Forrester, Steven Swanson and John "Danny" Olivas will continue training at NASA's Johnson Space Center in Houston as they await a new target launch date.

FMI: www.nasa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC