Endeavour Crew Performs Final Pre-Launch Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.16.24

Airborne-NextGen-09.17.24

Airborne-Unlimited-09.18.24

Airborne-FlightTraining-09.19.24

Airborne-Unlimited-09.20.24

Tue, Jul 17, 2007

Endeavour Crew Performs Final Pre-Launch Test

Simulated Launch Countdown Sets Stage For August 7 Launch

The seven-member crew for the next shuttle launch, STS-118, arrived at NASA's Kennedy Space Center in Florida on Monday evening for the terminal countdown demonstration test.

Often referred to as TCDT, the test is a final round of prelaunch training. It concludes with a simulated launch countdown for the crew and the launch team.

On Tuesday, the full crew visited the launch pad for fire suppression training and a driving lesson in the M-113 armored personnel carrier, which could carry them safely from the pad in an emergency.

Commander Scott Kelly and Pilot Charlie Hobaugh are scheduled to practice flying and landing the Shuttle Training Aircraft, which mimics the flying characteristics of a shuttle orbiter, Tuesday night.

As ANN reported, the space shuttle Endeavour arrived at Launch Pad 39A early July 11, and the STS-118 payload -- including the S5 truss, SPACEHAB module and external stowage platform 3 -- is secured inside the orbiter's payload bay.

Launch is targeted for the evening of August 7.

And Enough About The Spelling Bugaboo, Please

Mischievous scamps that we are, ANN was one of the first media outlets to pick up on an unfortunate error on a banner erected by NASA at Launch Pad 39A last week, proclaiming "Go Endeavor." Right sentiment, wrong spelling.

Within 90 minutes of the orbiter's arrival at the launch pad, NASA corrected the error (as seen in the photo above) but not before cameras captured the image, and transmitted it throughout the world. (See above, RE: "mischievous scamps.")

Turns out the erroneous spelling was the fault of a print shop NASA contractor Space Gateway Support used to create the banner. "Those guys are so embarrassed," Lisa Malone, director of external relations and business development at KSC, told Florida Today.

Due to the tight schedule, no one proofread the banner before it was put up at the pad.

"It was just a human mistake," Space Gateway Support spokesman Sam Gutierrez said. "But it's my department's responsibility, so I'll take the hit on that."

Hey, we understand. We can't begin to count the number of people who have misspelled Finfrock's name.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (09.17.24): Instrument Approach Procedure (IAP) Charts

Instrument Approach Procedure (IAP) Charts Portray the aeronautical data which is required to execute an instrument approach to an airport. These charts depict the procedures, incl>[...]

Aero-News: Quote of the Day (09.17.24)

“Our industry is approaching a 30-year innovation cycle, and we have less than 25 years to decarbonize aviation. We need to develop new methods to get net zero aerospace tech>[...]

Airborne 09.16.24: Bristell Shooting, EAA v FAA, Boeing Strike!

Also: Girls in Aviation Day, B-29 Doc Heads 4 Chino, C-17 Tail Cone Detaches, Bulgaria Airshow Accident One of two private aircraft that launched from Apatity Airport near Murmansk>[...]

Classic Aero-TV: CubCrafters NX Cub-A Stunning Effort To Build The ‘Perfect Cub'

From 2021 (YouTube Version): We Were Blown Away At How Well The Nosewheel Was Adapted To The X Cub Airframe It should not be a secret to any one of you, that with thousands of hour>[...]

Airborne 09.18.24: Boom XB-1 3rd Test, DJI Ban, SubSonex To EAA Museum

Also: Volato Nixed by Honda, New B-21 Bases, A-10 Unit Inactivated, Gogo/Airshare Boom Supersonic announced its demonstrator aircraft XB-1 successfully completed its third test fli>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC