AD: General Electric Company Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sat, Jul 24, 2021

AD: General Electric Company Turbofan Engines

AD 2021-14-11 Prompted By An Inspection By The Manufacturer That Revealed Cracking Of The HPT Rotor Stage 1 Disk

The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) CF6-80A and CF6-80C2 model turbofan engines.

This AD was prompted by an inspection by the manufacturer that revealed cracking of the high-pressure turbine (HPT) rotor stage 1 disk. This AD requires visual inspection and fluorescent penetrant inspection (FPI) of the HPT thermal shield and, if cracking is detected, removal from service of the HPT thermal shield, HPT rotor stage 1 disk and HPT rotor stage 2 disk. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective August 27, 2021.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to all General Electric Company (GE) CF6-80A, CF6-80A1, CF6-80A2, CF6-80A3, CF6-80C2A1, CF6-80C2A2, CF6-80C2A3, CF6-80C2A5, CF6-80C2A5F, CF6-80C2A8, CF6-80C2B1, CF6-80C2B1F, CF6-80C2B1F1, CF6-80C2B1F2, CF6- 80C2B2, CF6-80C2B2F, CF6-80C2B3F, CF6-80C2B4, CF6-80C2B4F, CF6-80C2B5F, CF6-80C2B6, CF6-80C2B6F, CF6-80C2B6FA, CF6-80C2B7F, CF6-80C2B8F, CF6-80C2D1F, CF6-80C2K1F, and CF6-80C2L1F model turbofan engines. The NPRM published in the Federal Register on February 22, 2021 (86 FR 10496). The NPRM was prompted by an inspection by the manufacturer that revealed cracking of the HPT rotor stage 1 disk caused by increased stress on the HPT rotor stage 1 disk as a result  of flangeto-flange cracking on the HPT thermal shield. In the NPRM, the FAA proposed to require visual inspection and FPI of the HPT thermal shield and, if cracking is detected, removal from service of the HPT thermal shield, HPT rotor stage 1 disk and HPT rotor stage 2 disk. The FAA is issuing this AD to address the unsafe condition on these products.

FMI: www.regulations.gov

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC