FAA Allowing Dreamliner Ferry Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Feb 07, 2013

FAA Allowing Dreamliner Ferry Flight

Not For Testing, Airplane To Be Repositioned From Fort Worth To Seattle

The FAA has approved a one-time ferry flight one of Boeing's Dreamliners, but no passengers will be on board.

The flight, which will reposition one of the airplanes from Boeing's paint facility in Fort Worth, TX back to Renton, WA today (Thursday) will be the first since all of the airplanes were grounded due to a series of incidents with the electrical system on the plane. The New York Times reports that the FAA has not yet given the go-ahead for test flights with the airplane to see if the issues with the batteries have been resolved.

NTSB chair Deborah Hersman plans to make a statement Thursday morning concerning the board's progress in the battery investigation. In a session with reporters Wednesday, Hersman said that the board is likely to examine the FAA's certification process for the lithium-ion batteries installed aboard the Dreamliner. She said that the investigation will likely go on for "several more weeks" before there is any definitive determination about why the batteries overheated, with one catching fire aboard a JAL Dreamliner as it sat at a gate at Boston Logan International Airport last month

After that cause is determined, it is expected that testing and approval of new systems for the Dreamliner could take months, as Boeing's engineers are reportedly working on several potential fixes for the problem.

(Top image courtesy Boeing, Lower image courtesy NTSB)

FMI: www.faa.gov, www.ntsb.gov, www.boeing.com


Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC