AD: Learjet, Inc. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Sep 20, 2018

AD: Learjet, Inc. Airplanes

AD NUMBER: 2018-19-04

PRODUCT: Certain Learjet, Inc. Models 28, 29, 31, 31A, 35, 35A, 36, 36A, 55, 55B, 55C, and 60 airplanes.

ACTION: Final Rule.

SUMMARY:  This AD was prompted by fatigue cracks initiating in the flap support structure due to repetitive flap loads, which has caused flap nose roller support bracket failure.

This AD requires replacement of the flap nose roller fitting, nose roller support bracket, and adjacent rib support structure with improved components.

DATES: This AD is effective October 23, 2018.

COST: The FAA estimates that this AD affects 706 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Replacement of flap nose roller fitting, nose roller support bracket, and adjacent rib support structure with improved components - 188 work-hours × $85 per hour = $15,980. Parts - $12,213. Total cost per operator - $28,193.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC